Why You Should Be Okay With Plan "B" | The Odyssey Online
Start writing a post
Student Life

Why You Should Be Okay With Plan "B"

No, not the pill but your future plans.

Why You Should Be Okay With Plan "B"
Google Images

With graduation nearing and everyone talking about what they are going to do after college got me thinking about how I should be (but am not) graduating this semester. I joined ROTC late so I had to take a fifth year, and with ROTC your MSIII year is all about accessions. For someone who wants Active Duty, accessions is really important right now and it's probably the most stressful thing ever.

But all this stress has made me realize a couple things, one of them being that it's good to have a dream and a plan. It's nice to be able to work for something and that's how life should be. But it has also made me realize that you need to have a backup plan. A contingency plan should be in effect just in case Plan A doesn't work. In my case, I want Active Duty and I am trying to make sure that if I don't get it, I'll be okay. Because there is nothing wrong with your plan B.

I am a firm believer in things happen for a reason, and I think that if I don't get active, there is something better I am being called to do. So a backup plan should include something that you would be more than happy doing in your life.

All in all, I fell like people need to be okay with the idea that their first choice in life may not be what they are supposed to do. I need to be okay with the idea that if I don't get active then maybe it just isn't the master plan for me and I think this can relate to anyone who is struggling with the idea of "what am I going to do after college..."

Report this Content
This article has not been reviewed by Odyssey HQ and solely reflects the ideas and opinions of the creator.
Entertainment

Every Girl Needs To Listen To 'She Used To Be Mine' By Sara Bareilles

These powerful lyrics remind us how much good is inside each of us and that sometimes we are too blinded by our imperfections to see the other side of the coin, to see all of that good.

Every Girl Needs To Listen To 'She Used To Be Mine' By Sara Bareilles

The song was sent to me late in the middle of the night. I was still awake enough to plug in my headphones and listen to it immediately. I always did this when my best friend sent me songs, never wasting a moment. She had sent a message with this one too, telling me it reminded her so much of both of us and what we have each been through in the past couple of months.

Keep Reading...Show less
Zodiac wheel with signs and symbols surrounding a central sun against a starry sky.

What's your sign? It's one of the first questions some of us are asked when approached by someone in a bar, at a party or even when having lunch with some of our friends. Astrology, for centuries, has been one of the largest phenomenons out there. There's a reason why many magazines and newspapers have a horoscope page, and there's also a reason why almost every bookstore or library has a section dedicated completely to astrology. Many of us could just be curious about why some of us act differently than others and whom we will get along with best, and others may just want to see if their sign does, in fact, match their personality.

Keep Reading...Show less
Entertainment

20 Song Lyrics To Put A Spring Into Your Instagram Captions

"On an island in the sun, We'll be playing and having fun"

Person in front of neon musical instruments; glowing red and white lights.
Photo by Spencer Imbrock on Unsplash

Whenever I post a picture to Instagram, it takes me so long to come up with a caption. I want to be funny, clever, cute and direct all at the same time. It can be frustrating! So I just look for some online. I really like to find a song lyric that goes with my picture, I just feel like it gives the picture a certain vibe.

Here's a list of song lyrics that can go with any picture you want to post!

Keep Reading...Show less
Chalk drawing of scales weighing "good" and "bad" on a blackboard.
WP content

Being a good person does not depend on your religion or status in life, your race or skin color, political views or culture. It depends on how good you treat others.

We are all born to do something great. Whether that be to grow up and become a doctor and save the lives of thousands of people, run a marathon, win the Noble Peace Prize, or be the greatest mother or father for your own future children one day. Regardless, we are all born with a purpose. But in between birth and death lies a path that life paves for us; a path that we must fill with something that gives our lives meaning.

Keep Reading...Show less
Facebook Comments